Correcting Misleading Comments by an Anti-nuclear Extremist

In a comment to a post below, Paul Gunter of the extremist antinuclear organization NIRS, completely mischaracterized the reasons behind and the effects of shutting down plants prior to a hurricane. A very knowledgeable colleague of mine, Howard Shaffer, who spent many years working as a systems engineer and who has tangled with Gunter previously, sent me this explanation:
If the grid is lost suddenly, a plant will scram and go on to the diesel generators, as designed and tested. Emergancy Core Cooling is not needed, since there is no leak. This feature is by design choice. It is possible to design nuclear power plants, even the large ones, to have a loss of the grid, and keep running to restart the grid. This makes for a more complicated and expensive design, since when the grid is lost, and the plant is at full load, and the plant is to keep running, the 4.5 million horsepower must go somewhere for a few seconds until reactor power is cut back. A design like this is not optimum in the whole grid system, since other types of plants can be and obviously are designed for black start and reenergizing the grid. Hydro plants are ideal for this. I started up Ludington Pumped storage in Michigan, which was designed to do this. We tested it to prove it could, and it was made an annual drill for the Operators.

As I recall, Vermont Yankee was originally designed and built to take a loss of the grid at full power, (full load reject) but this capability was dropped, I think based on upgraded reactor analytical results. The steam hardware was not removed, but of course the Reactor Protection system was made to scram on full load reject.

Plants are shut down in advance of anticipated grid loss (as from a hurricane) because of the conservative operational philosophy of never depending on Safety Systems to do a function that can be done without them.

The statement is completely mixed up when Gunter talks about operating off the grid for "Backup and Safety Systems" When Safety Systems are needed, the reactor is shut down, so it won't be making electric power. Conservative design assumes loss of the grid at the same time - i.e. the scram of the reactor and subsequent trip of the generator CAUSED the loss of the grid. Thus there is an emergency power supply with 100% backup, at least.
Technorati tags: , , ,

Comments

Anonymous said…
Lisa and Howard,

"Extremist" ...hmmm... now that's a relative term.

I suppose Lisa that you would be referencing my arrest record for trespass during the occupations of the Seabrook construction site,(Howard,didn't you profile non-violent anti-nuclear activists for Public Service of New Hampshire?)

and BTW,this very day, Rosa Parks is being brought into the Capitol Rotunda as a result of her once thought "extremist" actions during the civil rights movement. Very courageous, man or woman, to refuse to give a white person your seat on a bus anywhere in the South in those days.

Howard, I havent seen you since the PBMR senate briefing with Andy Kadak... Exelon dropped that one like a hot potato... good reasons.

Anyways, the unnecessary tag lines led me to digress from the original point of this discuss. What's so misleading about fact that U.S. nukes can't put the lights back on after a blackout?

In fact,as Howard points out that would make for "a more complicated and expensive design," chiefly from the safety risks I would say.
How abouty those "advanced" designs?

With regard to the reference to Vermont Yankee being originally contemplated for blackstart, there is the Vernon hydro-electric dam right there on the Connecuticut River which I think is more likely the reason.

There is also nothing misleading about the fact the OSREs typically seek to quickly put a unit into Station Blackout by taking down the transmission lines, first or simultaneously. The fact that a nuclear power plant's operation is umbilically dependent on a very long, brittle and unprotected transmission lines is an outrageous energy policy with its chin out post-911.

Paul, NIRS

Popular posts from this blog

An Ohio School Board Is Working to Save Nuclear Plants

Ohio faces a decision soon about its two nuclear reactors, Davis-Besse and Perry, and on Wednesday, neighbors of one of those plants issued a cry for help. The reactors’ problem is that the price of electricity they sell on the high-voltage grid is depressed, mostly because of a surplus of natural gas. And the reactors do not get any revenue for the other benefits they provide. Some of those benefits are regional – emissions-free electricity, reliability with months of fuel on-site, and diversity in case of problems or price spikes with gas or coal, state and federal payroll taxes, and national economic stimulus as the plants buy fuel, supplies and services. Some of the benefits are highly localized, including employment and property taxes. One locality is already feeling the pinch: Oak Harbor on Lake Erie, home to Davis-Besse. The town has a middle school in a building that is 106 years old, and an elementary school from the 1950s, and on May 2 was scheduled to have a referendu

Why Ex-Im Bank Board Nominations Will Turn the Page on a Dysfunctional Chapter in Washington

In our present era of political discord, could Washington agree to support an agency that creates thousands of American jobs by enabling U.S. companies of all sizes to compete in foreign markets? What if that agency generated nearly billions of dollars more in revenue than the cost of its operations and returned that money – $7 billion over the past two decades – to U.S. taxpayers? In fact, that agency, the Export-Import Bank of the United States (Ex-Im Bank), was reauthorized by a large majority of Congress in 2015. To be sure, the matter was not without controversy. A bipartisan House coalition resorted to a rarely-used parliamentary maneuver in order to force a vote. But when Congress voted, Ex-Im Bank won a supermajority in the House and a large majority in the Senate. For almost two years, however, Ex-Im Bank has been unable to function fully because a single Senate committee chairman prevented the confirmation of nominees to its Board of Directors. Without a quorum

NEI Praises Connecticut Action in Support of Nuclear Energy

Earlier this week, Connecticut Gov. Dannel P. Malloy signed SB-1501 into law, legislation that puts nuclear energy on an equal footing with other non-emitting sources of energy in the state’s electricity marketplace. “Gov. Malloy and the state legislature deserve praise for their decision to support Dominion’s Millstone Power Station and the 1,500 Connecticut residents who work there," said NEI President and CEO Maria Korsnick. "By opening the door to Millstone having equal access to auctions open to other non-emitting sources of electricity, the state will help preserve $1.5 billion in economic activity, grid resiliency and reliability, and clean air that all residents of the state can enjoy," Korsnick said. Millstone Power Station Korsnick continued, "Connecticut is the third state to re-balance its electricity marketplace, joining New York and Illinois, which took their own legislative paths to preserving nuclear power plants in 2016. Now attention should